Construction at the site the week has started with workers continuing to install the wall of windows on the southeast side's top floor.

Windows on the lower levels have been installed.


Duct work now stretches out like tree branches to each corner of the building.

Workers in the photo below colaborate as one operates a cherry-picker.
No comments:
Post a Comment